How to use diesel concrete pump correctly?

HBT-30 Diesel concrete pump
  1. First add hydraulic oil to the position shown in the video (the position indicated by the finger)
  2. Add 0.75 kg of oil at the bottom of the water tank, and then add water. The water must be filled with a small hole until the water flows out of the small hole.
  3. Fill the black parts with water
  4. Add diesel to the red diesel tank
  5. Come to the other side of the pump, squeeze the butter/lubricating oil, as shown in the video, be sure to squeeze a few more times to fill the pipes or other parts that need to be lubricated with lubricating oil.
  6. Come to the other side again, then you can start the pump, first open the small knife, and then check whether the wire on the battery is connected well. If it is loose, please tighten it with a tool.
  7. Come to the other side again, turn the key, press the small black button next to it, you can start it, then check the three gauges above, the one on the far right is the oil gauge, check if the pointer of the oil gauge moves, if not. It means that the oil is not in place and needs to be stopped immediately. The middle meter is used to display the power, and the left is the water temperature meter. Once the pointer reaches the red position, it means that the water is too stable and needs a rest.
    After starting the diesel engine, as shown in the video, increase the accelerator until it is suitable (you need to judge by yourself)
  8. Go to the other side again, if the power indicator button is not lit, turn the button below it to the right. When the light is on, it means that the pump can be officially started to work.
  9. Press button 3 next to the power indicator (start and stop the oil pump), and then press button 1 (start and stop the positive pump), and the concrete can be delivered normally.
    Note: Before the concrete is officially delivered, it is necessary to deliver water first, then deliver the mortar, and finally deliver the concrete
    Finally, there is the instruction of the remote control, but it is different from the one provided to you. For the specific usage, please refer to the second instruction of the following document.
Buttons:
No.1: 正泵启停 /Positive pump start and stop
      Function: This button is used to transport the concrete to destination(Where will you want the concrete )

No.2:反泵启停/Reverse pump start and stop
      Function: This button is used to Reverse suction concrete.
Why ? 
a) Because sometimes the pipe will be blocked,so we can use this button to reverse the big aggregate size
b) Sometimes the hopper of the pump still have the concrete ,but it doesn’t work,To prevent concrete from setting, we will use this button.
      How to use this button?
      Press this button with seconds: Such as:5-10s

No.3 油泵启停/Oil pump start and stop
      Function:this button is used to start and stop the pump.
      Noted:We have set the circuit, please try not to change it, after pressing this button, the pump will start normally

No.4 电源指示/Power indicator
      Function: This buttons is used to tell us it’s normal.

No.5/6缸一点动/缸二点动
:Stroke cylinder 1 jogging/Stroke cylinder 2 jogging

      Function:The manual button of the main oil cylinder and the pressure of the oil adjustment pump
      How and when ?
      When the delivery distance is relatively long or high, the delivery volume may be small or the delivery cannot be delivered. At this time, you can press and hold these two buttons for a few seconds or longer. At this time, the pressure of the delivery pump will increase. The pressure will be displayed on the pressure gauge
      Noted: If possible, please Try not to activate these two buttons

No.7 摆缸点动/Swing cylinder jog
     Function:this button is used to clean the S valve and Material tank.
     When ?
     After the pump stop, please Remove the steel pipe,just use water to clean the pipe, it’s OK.
     For the pump, please pour the water in the hopper, at this time, please press this button, it will clean the S valve and hopper and material tank,After a few minutes, please press Button 1, the Sewage or mixture will be out.

No.8 电源控制/power control
     Function: This button is Emergency button.
1. The specific operation process is as follows:
A) After filling up the diesel oil, water and lubricating oil, please start the diesel engine, please check the video in the attachment
   Of course, Everything is ready, Such as: Steel pipe,Hose and others
B) Open the control box, There will be a small knife switch, Push up to turn on the power, push down to turn off the power, At this time,Button 4 will be light up, It proves everything is OK and ready.
C) Right now please press Button 3, the pump will work normally.
D) Please pour the concrete into the hopper , and press button 1, the concrete will be delivered to the destination
E) When the pump doesn’t work or is blocked, please press Button 2
F) After finishing work, and pour the water into the hopper, and then press button 7 to clean the pump,For details, please refer to the function of button 7.

Facebook
Twitter
LinkedIn

Leave a Reply

Your email address will not be published. Required fields are marked *

4 × three =

Ask For A Quick Quote

We will contact you within 12 hours, please pay attention to the email with the suffix:  info@monlinindustries.com

Open chat
Need Help ?
Hello
Can we help you?